China National Standards
China Construction specifi GB Standards Search System  


 China "DL/T 5407-2009" standard english version information:

1. China DL/T 5407-2009 Standard Chinese version, you can purchase directly online; After receive your payment, we will send the GB Standards PDF file to your Email within 24 Hr.
2. China DL/T 5407-2009 Standard English version is not ready-made,only after get your order, then we translate them, time usually need 3-5 days. Detail refere: "How to purchase the English version China GB Standards?"
Item Content
GB Standard  Code DL/T 5407-2009
GB Standard Class China Electricity & Power Standard
GB Standard English Title Construction specification of inclined shaft and vertical shaft for hydropower and water resources engineering
GB Standard Chinese Title
Applicable Category China Electricity & Power-Electricity & Power
Chinese Version Price $15 USD per 50 pages
English Translation Price About $15  per 1 page; Detail enquire us for
Order
China "DL/T 5407-2009" Standard english version Add to Cart
Note The DL/T 5407-2009 standard english translation Prepayment unit $100 USD, is not mean this DL/T 5407-2009 standard english version price is $100 USD, it is only a basic unit of prepayment for translation, The actual translation fee and prepayment are depend on the amount of DL/T 5407-2009 standard Chinese words, We request 80% prepayment of the total translation fee.
For example, if the GB standard english price is $500, you need pay $400 prepayment, Four Quantities of the $100 prepayment unit.
  •  Relational standard of DL/T 5407-2009;    
  • Standard  Code GB Standard Title
  • GB/T 51217-2017
  • technical specification for joint construction and sharing of transmission lines
  • SY/T 4212-2017
  • (Oil and gas construction project construction quality acceptance specification high hydrogen sulfide gas field collection field...)
  • HG/T 20691-2017
  • (Technical specification for high pressure jet grouting construction)
  • HG/T 20229-2017
  • (Specification for Construction and Acceptance of Chemical Equipment and Pipeline Anticorrosion Engineering)
  • HG/T 20206-2017
  • (Chemical machinery installation engineering construction and acceptance specifications (small and medium-sized piston compressor))
  • HG/T 20205-2017
  • (Chemical machinery installation engineering construction and acceptance specifications (centrifugal compressor))
  • SY/T 4213-2017
  • (Oil and gas construction project construction quality acceptance specification high hydrogen sulfide gas field collection pipe...)
  • GB/T 32985-2016
  • Specification for construction and operation management of bus rapid transit system
  • JTG G10-2016
  • Specifications for Highway Construction Supervision
  • GB/T 33482-2016
  • Construction specification for electronic official document of Party and government organs
     
     

    +86-400-6578191        info@transcustoms.com 
    106# Zhongmao Mansion,No.1 Beizhan Road,Shenzhen,China
    ©  RJS Copyright  2001-2017 All Rights Reserved


    www.GBstandards.org