GB standards are the China national standards; Prefix code GB are Mandatory standards, GB/T are Recommended standards; All products or service must be compliance with GB standards; If you want to export products or services to huge Chinese market, need ensure they are meet the requirements of GB china national standards; We provide Chinese GB standards and English version GB standards Lookup, Translate, Download, Imported Commodity GB standards Testing and Compliance review services. |
Standard Code | Standard Title | Standard Class | Order |
---|---|---|---|
GB 14886-2016 |
Specifications for road traffic signal setting and Installation 道路交通信号灯设置与安装规范 |
China National Standards Installation |
English PDF |
GB/T 17625.9-2016 |
Electromagnetic compatibility—Limits—Signaling on low-voltage electrical Installations—Emission levels, frequency bands and electromagnetic disturbance levels 电磁兼容 限值 低压电气设施上的信号传输 发射电平、频段和电磁骚扰电平 |
China National Standards Installation |
English PDF |
GB/T 13951-2016 |
General rule of environmental tests of electric and electronic products for mobile platforms and offshore Installations 移动式平台及海上设施用电工电子产品环境试验一般要求 |
China National Standards Installation |
English PDF |
GB 51206-2016 |
Code for construction and quality acceptance of solar cell manufacturing equipment Installation engineering 太阳能电池生产设备安装工程施工及质量验收规范 |
China National Standards Installation |
English PDF |
GB/T 7094-2016 |
Vibration (sinusoidal) test method for electrical Installations in ships 船用电气设备振动(正弦)试验方法 |
China National Standards Installation |
English PDF |
GB 51194-2016 |
Code for design of engineering for telecommunication power supply equipment Installation 通信电源设备安装工程设计规范 |
China National Standards Installation |
English PDF |
GB/T 51193-2016 |
code for Installation and quality acceptance of PET and SSP equipments engineering 聚酯及固相缩聚设备工程安装与质量验收规范 |
China National Standards Installation |
English PDF |
GB 50386-2016 |
code for acceptance of engineering Installation for mechanical equipment of rolling mill 轧机机械设备工程安装验收规范 |
China National Standards Installation |
English PDF |
GB 50169-2016 |
Code for construction and acceptance of grounding connection electric equipment Installation engineering 电气装置安装工程接地装置施工及验收规范 |
China National Standards Installation |
English PDF |
GB/T 5959.10-2015 |
Safety in electroheating Installations —Part 10:Particular requirements for electrical resistance trace heating systems for industrial and commercial applications 电热装置的安全 第10部分:对工业和商业用电阻式伴热系统的特殊要求 |
China National Standards Installation |
English PDF |
GB/T 18110-2016 |
Electromechanical equipment guide for small hydroelectric Installations 小型水电站机电设备导则 |
China National Standards Installation |
English PDF |
GB/Z 22203-2016 |
Reliability test method of circuit-breakers for overcurrent protection for household and similar Installation 家用及类似场所用过电流保护断路器的可靠性试验方法 |
China National Standards Installation |
English PDF |
GB/T 32593-2016 |
Railway applications—Fixed Installations—Electronic power converters for substations 轨道交通 地面装置 变电所用电力电子变流器 |
China National Standards Installation |
English PDF |
GB/T 32586-2016 |
Railway applications—Fixed Installations—Electric traction specific requirements for composite insulators used for overhead contact line systems 轨道交通 地面装置 电力牵引架空接触网系统用复合绝缘子的特定要求 |
China National Standards Installation |
English PDF |
GB/T 32580.303-2016 |
Railway applications—Fixed Installations—Particular requirements for a.c.switchgear—Part 3-3: Measuement,control and protection devices for specific use in a.c. traction systems—Single-phase inductive voltage transformers 轨道交通 地面装置 交流开关设备的特殊要求 第3-3部分:交流牵引系统专用测量、控制和保护装置 单相感性电压互感器 |
China National Standards Installation |
English PDF |
GB/T 32580.302-2016 |
Railway applications—Fixed Installations—Particular requirements for a.c.switchgear—Part 3-2: Measuement,control and protection devices for specific use in a.c. traction systems—Single-phase current transformers 轨道交通 地面装置 交流开关设备的特殊要求 第3-2部分:交流牵引系统专用测量、控制和保护装置 单相电流互感器 |
China National Standards Installation |
English PDF |
GB/T 32580.301-2016 |
Railway applications—Fixed Installations—Particular requirements for a.c.switchgear—Part 3-1: Measurement, control and protection devices for specific use in a.c. traction system— Application guide 轨道交通 地面装置 交流开关设备的特殊要求 第3-1部分:交流牵引系统专用测量、控制和保护装置 应用指南 |
China National Standards Installation |
English PDF |
GB/T 32580.2-2016 |
Railway applications—Fixed Installations—Particular requirements for a.c. switchgear—Part 2: Single-phase disconnectors,earthing switches and switches with Un above 1KV 轨道交通 地面装置 交流开关设备的特殊要求 第2部分:Un大于1kV的单相隔离开关、接地开关和负荷开关 |
China National Standards Installation |
English PDF |
GB/T 32580.1-2016 |
Railway applications—Fixed Installations—Particular requirements for a.c.switchgear—Part 1: Single-phase circuit-breakers with Un above 1 kV 轨道交通 地面装置 交流开关设备的特殊要求 第1部分:Un大于1kV的单相断路器 |
China National Standards Installation |
English PDF |
GB/T 32579-2016 |
Railway application—Fixed Installations—Harmonisation of the rated values of the converter groups and tests on converter groups 轨道交通 地面装置 变流机组额定参数的协调及其试验 |
China National Standards Installation |
English PDF |
GB/T 32578-2016 |
Railway application—Fixed Installations—Electric traction overhead contact lines 轨道交通 地面装置 电力牵引架空接触网 |
China National Standards Installation |
English PDF |
GB/T 10963.3-2016 |
Circuit-breakers for overcurrent protection for household and similar Installation—Part 3: Circuit-breakers for d.c. operation 家用及类似场所用过电流保护断路器 第3部分:用于直流的断路器 |
China National Standards Installation |
English PDF |
GB 50150-2016 |
Electric equipment Installation engineeringstandard for hand-over test of electric equipment 电气装置安装工程电气设备交接试验标准 |
China National Standards Installation |
English PDF |
GB/Z 32519.3-2016 |
1000MW Class Hydraulic-generator—Part 3: Quality Inspection Standards For Installation 1000MW级水轮发电机 第3部分:安装质量检测导则 |
China National Standards Installation |
English PDF |
GB/T 5959.11-2016 |
Safety in electroheat Installations—Part 11: Particular requirements for installations using the effect of electromagnetic forces on liquid metals 电热装置的安全 第11部分:对液态金属电磁力作用装置的特殊要求 |
China National Standards Installation |
English PDF |
GB/T 3667.1-2016 |
AC motor capacitors—Part 1: General—Performance, testing and rating—Safety requirements—Guide for Installation and operation 交流电动机电容器 第1部分:总则 性能、试验和额定值 安全要求 安装和运行导则 |
China National Standards Installation |
English PDF |
GB/T 32517-2016 |
Installation couplers intended for permanent connection in fixed installations 固定装置中永久性连接用安装式耦合器 |
China National Standards Installation |
English PDF |
GB/T 10067.8-2016 |
Basic specifications for electroheat Installations—Part 8: Electroslag remelting furnaces 电热装置基本技术条件 第8部分:电渣重熔炉 |
China National Standards Installation |
English PDF |
GB/T 10066.11-2016 |
Test method for electroheat Installations—Part 11: Submerged-arc furnaces 电热装置的试验方法 第11部分:埋弧炉 |
China National Standards Installation |
English PDF |
GB/T 32348.2-2015 |
Electrical resistance trace heating systems for industrial and commercial applications—Part 2: Application guide for system design, Installation and maintenance 工业和商业用电阻式伴热系统 第2部分:系统设计安装和维护应用指南 |
China National Standards Installation |
English PDF |
GB/T 32347.2-2015 |
Railway applications—Environmental conditions for equipment—Part 2:Fixed electrical Installations 轨道交通 设备环境条件 第2部分:地面电气设备 |
China National Standards Installation |
English PDF |
GB/T 28267.3-2015 |
Steel cord conveyor belts—Part 3: Special safety requirements for belts for use in underground Installations 钢丝绳芯输送带 第3部分:井下用输送带的特殊安全要求 |
China National Standards Installation |
English PDF |
GB/T 32240-2015 |
Automatic milking Installations—Requirements and testing 自动挤奶设备 要求及测试方法 |
China National Standards Installation |
English PDF |
GB 51145-2015 |
Code for construction and acceptance of coal mine electrical equipment Installation engineering 煤矿电气设备安装工程施工与验收规范 |
China National Standards Installation |
English PDF |
GB/T 10067.35-2015 |
Basic specifications for electroheat Installations—Part 35: Medium frequency vacuum induction melting furnace 电热装置基本技术条件 第35部分:中频真空感应熔炼炉 |
China National Standards Installation |
English PDF |
GB/T 10067.34-2015 |
Basic specifications for electroheat Installations—Part 34:Transistor type high frequency induction heating installation 电热装置基本技术条件 第34部分:晶体管式高频感应加热装置 |
China National Standards Installation |
English PDF |
GB/T 10067.3-2015 |
Basic specifications for electroheat Installations—Part 3: Induction electroheat installation 电热装置基本技术条件 第3部分:感应电热装置 |
China National Standards Installation |
English PDF |
GB/T 10067.21-2015 |
Basic specifications for electroheat Installations—Part 21: Large capacity electric arc furnace using alternating current 电热装置基本技术条件 第21部分:大型交流电弧炉 |
China National Standards Installation |
English PDF |
GB/T 18884.4-2015 |
Household kitchen—Part 4: Design and Installation 家用厨房设备 第4部份:设计与安装 |
China National Standards Installation |
English PDF |
GB/T 14555-2015 |
Requirements for interface and Installation of marine radar 船用导航雷达接口及安装要求 |
China National Standards Installation |
English PDF |
GB/T 30839.46-2015 |
Energy consumption grading for industrial electroheat Installations—Part 46:Crystal growing furnaces 工业电热装置能耗分等 第46部分:单晶炉 |
China National Standards Installation |
English PDF |
GB/T 30839.45-2015 |
Energy consumption grading for industrial electroheat Installations— part 45:Box-type quenching resistance furnace 工业电热装置能耗分等 第45部分:箱式淬火电阻炉 |
China National Standards Installation |
English PDF |
GB/T 30839.44-2015 |
Energy consumption grading for industrial electroheat Installations—part 44:Bogie hearth resistance furnace 工业电热装置能耗分等 第44部分:台车式电阻炉 |
China National Standards Installation |
English PDF |
GB/T 30839.43-2015 |
Energy consumption grading for industrial electroheat Installations—Part 43:Box-type resistance furnace 工业电热装置能耗分等 第43部分:箱式电阻炉 |
China National Standards Installation |
English PDF |
GB/T 30839.34-2015 |
Energy consumption grading for industrial electroheat Installations—Part 34:Mains frequency induction channel furnaces 工业电热装置能耗分等 第34部分:工频有心感应炉 |
China National Standards Installation |
English PDF |
GB/T 30839.33-2015 |
Energy consumption grading for industrial electroheat Installations—Part 33:Mains frequency coreless induction furnace 工业电热装置能耗分等 第33部分:工频无心感应炉 |
China National Standards Installation |
English PDF |
GB/T 30839.2-2015 |
Energy consumption grading for industrial electroheat Installations—Part 2:Three-phase steelmaking arc furnace 工业电热装置能耗分等 第2部分:三相炼钢电弧炉 |
China National Standards Installation |
English PDF |
GB/T 30839.21-2015 |
Energy consumption grading for industrial electroheat Installations—Part 21:Ladle refining furnace 工业电热装置能耗分等 第21部分:钢包精炼炉 |
China National Standards Installation |
English PDF |
GB/T 16915.6-2015 |
Switches for household and similar fixed electrical Installations—Part 2-5: Switches and related accessories for use in home and building electronic systems (HBES) 家用和类似用途固定式电气装置的开关 第2-5部分:住宅和楼宇电子系统(HBES)用开关及有关附件 |
China National Standards Installation |
English PDF |
GB/T 10067.413-2015 |
Basic specifications for electroheat Installations—Part 413:Resistance furnaces using in the experiments 电热装置基本技术条件 第413部分:实验用电阻炉 |
China National Standards Installation |
English PDF |
GB/T 10067.412-2015 |
Basic specifications for electroheat Installations—Part 412:Box-type quenching furnaces 电热装置基本技术条件 第412部分:箱式淬火炉 |
China National Standards Installation |
English PDF |
GB/T 31882-2015 |
General Installation requirements of S-lay system equipments for ships S型铺管作业线设备船上安装通用技术要求 |
China National Standards Installation |
English PDF |
GB/T 7946-2015 |
Electrical Installation and safe operation of electric security fences 脉冲电子围栏及其安装和安全运行 |
China National Standards Installation |
English PDF |
GB/T 19134-2015 |
Tri-wheel vehicles and low-speed goods vehicles—Rear view mirrors—Requirements of performance and Installation 三轮汽车和低速货车 后视镜 性能和安装要求 |
China National Standards Installation |
English PDF |
GB/T 19119-2015 |
Tri-wheel vehicles and low-speed goods vehicles—Prescription for Installation of lighting and light signalling devices 三轮汽车和低速货车 照明与信号装置的安装规定 |
China National Standards Installation |
English PDF |
GB/T 29165.4-2015 |
Petroleum and natural gas industries—Glass-reinforced plastics(GRP) piping—Part 4: Fabrication, Installation and operation 石油天然气工业 玻璃纤维增强塑料管 第4部分:装配、安装与运行 |
China National Standards Installation |
English PDF |
GB/T 51109-2015 |
Code for Installation and quality acceptance of spandex equipment 氨纶设备工程安装与质量验收规范 |
China National Standards Installation |
English PDF |
GB 51105-2015 |
Code for Installation and acceptance for engineering equipment of extrusion steel pipe 挤压钢管工程设备安装与验收规范 |
China National Standards Installation |
English PDF |
GB 51104-2015 |
Code for Installation and acceptance for engineering equipment of grain-oriented silicon steel production line 取向硅钢生产线设备安装与验收规范 |
China National Standards Installation |
English PDF |
GB/T 51090-2015 |
Code for Installation and quality acceptance of yarn-dyed woven equipment engineering 色织设备工程安装与质量验收规范 |
China National Standards Installation |
English PDF |
GB/T 51089-2015 |
Code for Installation and quality acceptance of knitting equipment engineering 针织设备工程安装与质量验收规范 |
China National Standards Installation |
English PDF |
GB/T 51088-2015 |
Code for Installation and quality acceptance of silk equipment engineering 丝绸设备工程安装与质量验收规范 |
China National Standards Installation |
English PDF |
GB/T 51075-2015 |
Code for Installation of mineral processing equipment engineering 选矿机械设备工程安装规范 |
China National Standards Installation |
English PDF |
GB/T 30673-2014 |
Installation and maintenance specification of automatic storage and retrieval system 自动化立体仓库的安装与维护规范 |
China National Standards Installation |
English PDF |
GB/T 16895.6-2014 |
Low-voltage electrical Installations―Part 5-52: Selection and erection of electrical equipment-Wiring systems 低压电气装置 第5-52部分:电气设备的选择和安装 布线系统 |
China National Standards Installation |
English PDF |
GB 31094-2014 |
Safety rules for the construction and Installation of lifts for explosive atmospheres 防爆电梯制造与安装安全规范 |
China National Standards Installation |
English PDF |
GB 5959.5-2014 |
Safety in electroheat Installations―Part 5: Particular requirements for plasma installations 电热装置的安全 第5部分:对等离子体装置的特殊要求 |
China National Standards Installation |
English PDF |
GB/T 30839.42-2014 |
Energy consumption grading for industrial electroheat Installations―Part 42:Pit resistance furnace 工业电热装置能耗分等 第42部分:井式电阻炉 |
China National Standards Installation |
English PDF |
GB/T 30839.32-2014 |
Energy consumption grading for industrial electroheat Installations―Part 32:A set of medium frequency coreless induction furnaces with a voltage type frequency converter 工业电热装置能耗分等 第32部分:电压型变频多台中频无心感应炉成套装置 |
China National Standards Installation |
English PDF |
GB/T 30839.31-2014 |
Energy consumption grading for industrial electroheat Installations―Part 31:Medium frequency coreless induction furnaces 工业电热装置能耗分等 第31部分:中频无心感应炉 |
China National Standards Installation |
English PDF |
GB/T 10067.411-2014 |
Basic specifications for electroheat Installations―Part 411:Electroheat bath furnace 电热装置基本技术条件 第411部分:电热浴炉 |
China National Standards Installation |
English PDF |
GB/T 10067.410-2014 |
Basic specifications for electroheat Installations―Part 410: Single crystal growing furnace 电热装置基本技术条件 第410部分:单晶炉 |
China National Standards Installation |
English PDF |
GB/T 10066.3-2014 |
Test methods for electroheat Installations―Part 3: Induction channel and induction crucible furnaces 电热装置的试验方法 第3部分:有心感应炉和无心感应炉 |
China National Standards Installation |
English PDF |
GB 51062-2014 |
Code for construction of coal mine equipment Installation engineering 煤矿设备安装工程施工规范 |
China National Standards Installation |
English PDF |
GB 51059-2014 |
Code for construction and acceptance of nonferrous metals processing mechanical Installation engineering 有色金属加工机械安装工程施工与质量验收规范 |
China National Standards Installation |
English PDF |
GB 51049-2014 |
Code for construction and acceptance of series capacitor Installation electrical equipment installation engineering 电气装置安装工程串联电容器补偿装置施工及验收规范 |
China National Standards Installation |
English PDF |
GB 51035-2014 |
Code for Installation and acceptance of pure water system of electronic industry 电子工业纯水系统安装与验收规范 |
China National Standards Installation |
English PDF |
GB 50257-2014 |
Code for construction and acceptance of electric equipment on fire and explosion hazard electrical equipment Installation engineering 电气装置安装工程爆炸和火灾危险环境电气装置施工及验收规范 |
China National Standards Installation |
English PDF |
GB 50256-2014 |
Code for construction and acceptance of electric device of crane electrical equipment Installation engineering 电气装置安装工程起重机电气装置施工及验收规范 |
China National Standards Installation |
English PDF |
GB 16915.1-2014 |
Switches for household and similar fixed-electrical Installations―Part 1: General requirements 家用和类似用途固定式电气装置的开关 第1部分:通用要求 |
China National Standards Installation |
English PDF |
GB/T 30839.4-2014 |
Energy consumption grading for industrial electroheat Installations―Part 4: Indirect resistance furnaces 工业电热装置能耗分等 第4部分:间接电阻炉 |
China National Standards Installation |
English PDF |
GB/T 30839.41-2014 |
Energy consumption grading for industrial electroheat Installations―Part 41:Pusher resistance heating unit 工业电热装置能耗分等 第41部分:推送式电阻加热机组 |
China National Standards Installation |
English PDF |
GB/T 10067.49-2014 |
Basic specifications for electroheat Installations―Part 49: Natural convection pit resistance furnaces 电热装置基本技术条件 第49部分:自然对流井式电阻炉 |
China National Standards Installation |
English PDF |
GB/T 10067.48-2014 |
Basic specifications for electroheat Installations―Part 48: Bogie hearth resistance furnaces 电热装置基本技术条件 第48部分:台车式电阻炉 |
China National Standards Installation |
English PDF |
GB/T 10067.47-2014 |
Basic specifications for electroheat Installations―Part 47: Vacuum heat treatment and brazing furnace 电热装置基本技术条件 第47部分:真空热处理和钎焊炉 |
China National Standards Installation |
English PDF |
GB/T 10067.46-2014 |
Basic specifications for electroheat Installations―Part 46: Resistance bell furnace 电热装置基本技术条件 第46部分:罩式电阻炉 |
China National Standards Installation |
English PDF |
GB/T 10067.33-2014 |
Basic specifications for electroheat Installations―Part 33: Mains frequency induction crucible furnace for melting copper 电热装置基本技术条件 第33部分:工频无心感应熔铜炉 |
China National Standards Installation |
English PDF |
GB/T 10066.5-2014 |
Test methods for electroheat Installations—Part 5:Plasma equipment for electroheat and electrochemical applications 电热装置的试验方法 第5部分:电热和电化学用等离子体设备 |
China National Standards Installation |
English PDF |
GB 51037-2014 |
Code for construction and acceptance of micro-assembling production line process equipment Installation engineering 微组装生产线工艺设备安装工程施工及验收规范 |
China National Standards Installation |
English PDF |
GB 51011-2014 |
Code for construction and acceptance of coal mine preparation equipment Installation engineering 煤矿选煤设备安装工程施工与验收规范 |
China National Standards Installation |
English PDF |
GB/T 30841-2014 |
General requirements for high-voltage shunt capacitor Installations 高压并联电容器装置的通用技术要求 |
China National Standards Installation |
English PDF |
GB/T 30839.1-2014 |
Energy consumption grading of industrial electroheat Installations―Part 1:General requirements 工业电热装置能耗分等 第1部分:通用要求 |
China National Standards Installation |
English PDF |
GB/T 10067.45-2014 |
Basic specifications for electroheat Installations―Part 45: Vacuum quenching furnace 电热装置基本技术条件 第45部分:真空淬火炉 |
China National Standards Installation |
English PDF |
GB/T 10067.44-2014 |
Basic specifications for electroheat Installations―Part 44: Box-type resistance furnaces 电热装置基本技术条件 第44部分:箱式电阻炉 |
China National Standards Installation |
English PDF |
GB/T 10067.43-2014 |
Basic specifications for electroheat Installations―Part 43: Forced convection pit resistance furnaces 电热装置基本技术条件 第43部分:强迫对流井式电阻炉 |
China National Standards Installation |
English PDF |
GB/T 30556.7-2014 |
Electromagnetic compatibility―Installation and mitigation guidelines―Degrees of protection provided by enclosures against electromagnetic disturbances (EM code) 电磁兼容 安装和减缓导则 外壳的电磁骚扰防护等级(EM编码) |
China National Standards Installation |
English PDF |
GB/T 50976-2014 |
Code for Installation and acceptance of protection equipment and secondary circuit in infrastructure project 继电保护及二次回路安装及验收规范 |
China National Standards Installation |
English PDF |
GB 50254-2014 |
Code for construction and acceptance of low-voltage apparatus Electric equipment Installation engineering 电气装置安装工程低压电器施工及验收规范 |
China National Standards Installation |
English PDF |
GB/T 50064-2014 |
Code for design of overvoltage protection and insulation coordination for AC electrical Installations 交流电气装置的过电压保护和绝缘配合设计规范 |
China National Standards Installation |
English PDF |
GB/T 9109.3-2014 |
Dynamic measurement of petroleum and liquid petroleum products―Part 3: Technical requirements of Installation for pipe prover 石油和液体石油产品动态计量 第3部分:体积管安装技术要求 |
China National Standards Installation |
English PDF |
Find out:641Items | To Page of: First -Previous-Next -Last | 1 2 3 4 5 6 7 |